MISSOURI BOTTOM ROAD RECONSTRUCTION

MISSOURI BOTTOM ROAD RECONSTRUCTION STP-9900(692)

HAZELWOOD, MO

 

CIVIL ENINGEERING

 

  • RECONSTRUCTION OF EXISTING 1,200 LF WINDING, TWO-LANE, 22-FOOT WIDE ASPHALT PAVEMENT WITH OPEN DRAINAGE TO A NEW TWO-LANE, 29-FOOT WIDE PAVEMENT WITH INTEGRAL CURB AND 2,000 LF OF ENCLOSED DRAINAGE
     
  • NEW CONCRETE SIDEWALKS LENGTH OF ROAD
     
  • MODULAR BLOCK RETAINING WALLS, GUARD RAILS
     
  • GREATLY IMPROVED UNSAFE SITE CONDITIONS BY CHANGING HORIZONTAL AND VERTICAL ALIGNMENTS
     
  • DESIGNED UNDERDRAIN SYSTEM PARALLEL TO ROADWAY SLOPE TO DIVERT SUBSURFACE GROUNDWATER AWAY FROM UNDERLYING SHALE, INCLUDING DESIGN OF 3,800 LF OF INTERCEPTOR AND COLLECTOR SLOPE DRAINS

 

Services Performed

CIVIL ENGINEEING, PROJECT MANAGEMENT