FRONTENAC STORMWATER

FRONTENAC STORMWATER MASTER PLAN & IMPLEMENTATION

FRONTENAC, MO

 

CIVIL DIVISION

 

STORMWATER NEEDS ASSESSMENT

PROGRAM IMPLEMENTATION

 

  1. STORMWATER MANAGEMENT DESIGN (20 PROJECTS)
    1. Rain Garden Design
    2. Creek Bank Stabilization
    3. Roadway Sub-Surface Drainage
    4. Storm Sewers
    5. Sediment Transport Modeling
  2. STORMWATER PLAN REVIEW (80 PROJECTS)
  3. FRONTENAC GRANT PROGRAM ASSISTANCE
  4. SUPPLEMENTAL FUNDING PROCUREMENT
  5. ENVIRONMENTAL COMPLIANCE
  6. ORDINANCE SUPPORT

 

"EDM Incorporated has provided engineering service to the City Of Frontenac in the creation and implementation of our Stormwater Master Plan. Their work in the Master Plan creation includes city-wide hydrologic and hydraulic studies, development of conceptual solutions, and prioritization of the improvement projects by benefit points with recommendations from the Public Works Committee. EDM has been and continues to produce construction plans and specifications for the conceptual solutions to resolve issues that include structural flooding and eroding creek banks for the entire City. “

"Len Madalon and Ed Bliss are very good to work with.  The ability to adapt to our resident's needs/concerns is very important to the City and shows in the finished product of our projects."

Jeff Wappelhorst, Public Works Director

City of Frontenac